Administrative Data Center Services

The Main UTSA Data Center provides a secure and environmentally controlled center for many of the systems critical to the university's operations. The data center also provides space for departmental servers. 

All power, data cabling, etc. is ran overhead and the raised floor space is used for air flow to cool the room.

The Main Data Center is equipped with four 20 ton computer room air conditioning units (CRACs), a main UPS unit which supplies 160 kW of conditioned power to the data center, and an emergency power generator.

 

Square Footage

  • The outer staging area/work room is 297 sq. ft.
  • The server area is 2772 sq. ft.  
  • The entire Main Data Center floor space is 3,069 sq. ft.