Browse by Category

Browse by Date

Archived Stories

Browse by Category

You are searching for articles in Construction and Maintenance.

313 total records.
<-- Previous 20 | Next 20 -->
Title Date
UTSA Main Campus maintenance: Electrical transformers at Ximenes garage 12/19/13
UTSA Main Campus: Barshop Boulevard reduced to one lane for repairs 12/10/13
UTSA Main Campus: Cooling shutdown during holiday, gas line installation 11/20/13
UTSA Main Campus maintenance: Sombrilla Plaza column drains to be cleaned 11/13/13
UTSA Main Campus: Lighting upgrades in parking adjacent to Chisholm Hall 11/12/13
UTSA Main Campus: After-hours cooling outages are scheduled through Nov. 29 11/12/13
UTSA Main Campus: Sombrilla Plaza fountain repairs to be complete Jan. 13 11/7/13
Help raise $10K to repair and restart iconic UTSA Sombrilla Plaza fountain 11/6/13
UTSA Boulevard road project will widen thoroughfare to four lanes 10/25/13
UTSA Main Campus: Tower construction crane to be dismantled Oct. 4-5 9/30/13
Extreme Makeover, UTSA Edition: Campus beautification project is Oct. 4 9/27/13
Traffic alert: Market Street closure and detour may impede downtown traffic 9/26/13
Air conditioning at UTSA Main Campus restored Sept. 19 after outage 9/20/13
Air conditioning at UTSA Main Campus is being restored after outage 9/19/13
Sept. 13 emergency training exercise at UTSA Main Campus is canceled 9/11/13
UTSA Tri-campus annual fire alarm testing schedule is set 9/10/13
UTSA Roadrunner Days: San Saba Hall ribbon cutting is 3 p.m. Aug. 27 8/26/13
PHOTO GALLERY: UTSA Park West athletics complex dedication, Aug. 16 8/19/13
UTSA Main Campus maintenance: New lighting at Chisholm Hall parking lot 8/9/13
UTSA Main Campus: Tobin garage repair work to block some parking spaces 8/9/13
<-- Previous 20 | Next 20 -->