Verizon DAS Project prompts partial road closure on Main Campus
(June 22, 2015) -- The intersection of Cook and Cocke roads will be partially shut-down from June 25, 2015 through June 28, 2015 as part of the Verizon Distributed Antenna Systems (DAS) project.
The intersection will be shut-down each day from 7:00 a.m. to 5:00 p.m. for trenching that will provide a pathway for the installation of a 50-foot-long conduit.
Due to the open trench this area will be restricted. Anyone requiring access to the tunnel area near the construction site will need to enter from the south side of the campus near the BSE and AET buildings.
For additional information please contact Facilities Work Control at 210-458-4262.
------------------------------
Connect online with UTSA on Twitter, Facebook, YouTube and Instagram.
Events
This event will acknowledge graduating seniors from the McNair Scholars program at UTSA before inducting the new cohort of scholars into the program.
North Paseo Building (NPB 5.140), Main CampusAt this memorable celebration, UTSA graduates will be introduced one-by-one to cross the stage and accept their doctoral degrees.
Arts Building Recital Hall, Main CampusRoadrunner Walk is an event for graduating students to have a memorable walk on campus to celebrate an important milestone and their achievements. Graduates will walk along the Paseo while being celebrated by the UTSA community, friends, and family members.
Student Union Paseo, Main CampusCelebrate the accomplishments of College of Education and Human Development, College for Health, Community and Policy, College of Sciences and University College.
Alamodome, 100 Montana St.Celebrate the accomplishments of Alvarez College of Business, College of Liberal and Fine Arts and Klesse College of Engineering and Integrated Design.
Alamodome, 100 Montana St.