Elimination of the Energy Fee
q2009 E&G Utility Cost Est.       $10.60M
q Rate/demand increase of 8%
q$1.1 M beyond construction demand for Engineering Bldg
q
q2009 E&G Utility Cost Est.       $11.45M
qRate/demand increase of 8%
qNo new facilities on line
q
q