Elimination of the Energy Fee
q
2009 E&G Utility Cost Est.
$10.60M
q
Rate/demand increase of 8%
q
$1.1 M beyond construction demand for Engineering Bldg
q
q
2009 E&G Utility Cost Est.
$11.45M
q
Rate/demand increase of 8%
q
No new facilities on line
q
q