July
July 22, 2026
Temporary Hydration Station, Water Fountain Closure - Durango Building and Annex
To support necessary upgrades, hydration stations and water fountains in the Durango Building (DB) and Durango Building Annex (DBA) will be unavailable from Tuesday, July 21, through Wednesday, July 29.
July 21, 2026
Bauerle Road Garage: Intermittent Power Outages July 23-30
Due to planned emergency phone upgrades, intermittent power outages can be expected at the Bauerle Road Garage (BRG) between 7 a.m. to 4 p.m. on weekdays from Thursday, July 23 through Thursday, July 20.
July 17, 2026
Unplanned Cooling Outage - Bauerle Road Garage
Due to mechanical issues, an unplanned cooling outage has occurred at the Bauerle Road Garage (BRG) on the Main Campus. During the outage, occupants may experience higher than normal building temperatures.
July 15, 2026
Unplanned Corridor Lighting Outage - Buena Vista Building
Due to unscheduled maintenance, hallway lighting on the third floor of the Buena Vista Building (BVB) at the Downtown Campus will be unavailable from 8 a.m. to 4 p.m. Wednesday, July 15, while corridor lights are being replaced.
July 10, 2026
Blanco Hall LEED Silver certification demonstrates university’s commitment to sustainable campus growth
Facilities will begin a crosswalk refurbishment project on Main Campus roadways from Monday, July 13, through Friday, July 31. For your safety, please watch for posted barricades, signage, and traffic control personnel, who will direct pedestrian and vehicle traffic safely around the work areas.
July 9, 2026
Crosswalk Refurbishment Project Scheduled July 13-31
Facilities will begin a crosswalk refurbishment project on Main Campus roadways from Monday, July 13, through Friday, July 31. For your safety, please watch for posted barricades, signage, and traffic control personnel, who will direct pedestrian and vehicle traffic safely around the work areas.
July 2, 2026
Unplanned Restroom Closures at Frio Street Building
An unplanned restroom closure has occurred at the Frio Street Building (FS) at Downtown Campus due to emergency repairs. During the outage, restrooms on the building’s south side will be unavailable until repairs are completed.
July 1, 2026
Unplanned Water Outage - CAR, SFF, RWS
Due to emergency repairs, water is currently unavailable at the Center for Archaeological Research (CAR), Support Services Facility F (SSF), and the Lab and Waste Storage Building (RWS). Facilities is currently working to restore service as quickly as possible.
July 1, 2026
Unplanned Restroom Closures - Main Building
An unplanned restroom closure has occurred at the Main Building (MB) at Main Campus due to emergency repairs. Restrooms on the building’s east side will be unavailable until repairs are completed. The affected restrooms are MB-0.322, MB-0.324, MB-1.220, MB-1.222, MB-2.330, MB-2.328, MB-3.322, and MB-3.320.